stela-logo
  • Home
  • Services
    • Gas
    • Power
    • Telco
    • Water
  • Careers
  • Contact

Abolishment of existing services

I’m planning to demolish my property, what do I need to remove my existing power connection?

To apply for an abolishment, we will require photos of the existing electrical meter(s) to be removed, and the NMI number(s) associated with the meter(s). Please have this ready and send through your enquiry below.

I need other services to be abolished as well. Can STELA have this organised?

Our team can arrange to have your Telecommunications, Gas, and Power disconnected. Please include what services you require abolished in your enquiry, and for our team to best assist you.

Question still unanswered? Fill out the form below, and we’ll get back to you as soon as we can!
stela-logo
Stela Group | Victoria

4 Expo Crt, Mt Waverley

P: (03) 9645 8988

E: info@stelagroup.com.au

Stela Group | Queensland

5 Boundary Street, Brisbane

P: (07) 3071 9276

E: info@stelagroup.com.au

Stela Group | South Australia

15 Colley Terrace, Glenelg

P: (08) 8310 0286

E: info@stelagroup.com.au

Designed by TheTubes | © Stela Group